![]() Lane closures from Carland Cross to Mitchell during September 2023įrom 3 September to the end of the month, there will be lane closures in both directions between Carland Cross and Mitchell. This includes the westbound approach to Carland Cross.Īt the end of the month the A30 between Mitchell and Carland Cross will be changed to a contraflow (one lane in either direction) until the opening of the new road.Īdvance warning of future weekend closures: Please plan ahead and allow extra time for your journey. The above diversion route will be in place. create tie ins to the new A30 dual carriageway.progress work to open the B3284 Chybucca link as part of the new junction.The A30 will be closed between Scorrier and Boxheater from 8pm on Friday 15 September until 6am on Monday 18 September. Traffic will be diverted via the B3285, the A3075 and the B3277.Ī30 weekend closure Scorrier to Boxheater: 15 - 18 Septemberįollowing the summer school holidays, we are resuming closures to work towards the opening of the new road. The A30 will be closed in both directions between Scorrier and Boxheater from 8pm to 6am the following morning. This will see the start of construction of the new section of dual carriageway linking Carland Cross junction to the existing A30. Overnight closures will be needed to carry out preparation work ahead of the weekend closure. Overnight closures Scorrier to Boxheater: 11 - 14 September, 8pm to 6am ![]() ![]() Overnight closures 11 to 14 September and weekend closure 15 to 18 September ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |